SURFACE PREPARATION
- Old dirty gypsum based concrete should be cleaned thoroughly removing
all old glue and adhesives, oils, and any other contaminants. After
cleaning, rinse surface thoroughly with water.
- Allow 24 hours for the surface to dry before application of Gyp-Lock.
- If concrete is clean, thoroughly sweep area of dust and debris.
APPLICATION INSTRUCTIONS
- Apply Gyp-Lock at a rate of 250 square feet per gallon making sure to thoroughly saturate the surface.
- If puddling occurs move product to areas where there are no puddles.
- Distribute Gyp-Lock evenly with a roller applying little to no pressure to roller.
- Allow 1st coat to dry 1 to 2 hours
- Apply 2nd coat using the same instructions as the 1st coat.
- Once floor has thoroughly dried, sweep floor clean.
|
|
COPYRITE 2005 All Rights Reserved