gyplock logo
Lite Blue
become a distributor company information frequently asked questions
contact information
independant test data
Lite Blue

product information

technical data sheet

product pricing

product installation

product warranty

product msds sheet

product specification sheet

payment terms




 



































































installation
Toll Free 1-866-878-7069
SURFACE PREPARATION
  • Old dirty gypsum based concrete should be cleaned thoroughly removing all old glue and adhesives, oils, and any other contaminants.  After cleaning, rinse surface thoroughly with water.
  • Allow 24 hours for the surface to dry before application of Gyp-Lock.
  • If concrete is clean, thoroughly sweep area of dust and debris.

APPLICATION INSTRUCTIONS
  • Apply Gyp-Lock at a rate of 250 square feet per gallon making sure to thoroughly saturate the surface. 
  • If puddling occurs move product to areas where there are no puddles. 
  • Distribute Gyp-Lock evenly with a roller applying little to no pressure to roller. 
  • Allow 1st coat to dry 1 to 2 hours
  • Apply 2nd coat using the same instructions as the 1st coat.
  • Once floor has thoroughly dried, sweep floor clean.









































COPYRITE 2005 All Rights Reserved
Cornerstone Coatings International Inc.